95 MW of firm grid power, energized and ready to connect to your lot.
Available now
95 MW of firm grid power. The substation has two 250 MVA transformers.
Next
The substation is built with room to grow, and the next tranche is already in process.
Long term
A path to gigawatt-scale power, built on the park’s own 400 kV substation and dedicated line.

- 2024400 kV grid connection secured
- July 2026400 kV line energized
- August 2026Substation inaugurated