Power in service today

The park has its own 400 kV substation, energized in 2026 and connected to the national grid by a dedicated 400 kV line. Firm supply for the park is already secured.

Aerial view of the 400 kV substation with hills behind

95 MW of firm grid power, energized and ready to connect to your lot.

Available now

95 MW of firm grid power. The substation has two 250 MVA transformers.

Next

The substation is built with room to grow, and the next tranche is already in process.

Long term

A path to gigawatt-scale power, built on the park’s own 400 kV substation and dedicated line.

The park's two 250 MVA transformers, seen from above, with crews walking past
The park's two 250 MVA transformers, in service since 2026.
  1. 2024400 kV grid connection secured
  2. July 2026400 kV line energized
  3. August 2026Substation inaugurated